Hello SVTR friends and members-
Ray Leeman will be holding a work party on Saturday, June 22.
Tools for the day will be: weed whackers, lopers and other tools for small brush. Also as the trails are still very wet, please do what you can to minimize the damage as you pass through wet areas. If you see water bars that need help, please do what you can to fix them up.
There are a number of areas that need attention and task lists will be available at the trail head.
As usual, meet at the Joy Brook trail head at 9 am. Bring drinks and a lunch or visit either of our destinations, the Stuffed Bun or the Dam Diner, for lunch.
For more information, please contact:
Ray Leeman
Secretary and Trail Boss, SVTR
203-937-6028
UPDATE From Lloyd:
Our trails are open but keep in mind the Miller Farm Trailhead is still closed until further notice.
Please be advised there will also be work on the Trail 2 bridge leading to the Stuffed Bun. Signs are already up showing a detour around the construction site. Because the majority of the work is heavy equipment, I do not need extra help at this point. However, because of the condition of the trails, our main focus should be on assisting Ray in getting the trails in order.
For all attending the work party, please do not park near the concrete blocks, picnic tables or I-beams, as we will need this area for the construction.
Deb Church will be available from 8am till 10:30am at the trailhead if anyone needs to sign up or re-sign their SVTR/VASA 2013 membership.
Thank you all for your cooperation and support.
Lloyd SVTR
Hope to see you on the trails.
-Bill Ortlieb
Webmaster, SVTR