Meeting started @ 7:10pm
New SVTR T-Shirts are now available! $20 each. All proceeds go back into our trail system. See the bottom of this post for images of the new shirt design.
Secretary’s report read and accepted.
Treasurer’s report read and accepted.
- As of last month’s meeting, SVTR had 21 members and 19 VASA registered machines.
Webmaster’s report read.
President’s report:
- Joy brook bridge will be inspected and a decision made as to keeping the trail open or closed until replacement.
- We will be collecting stones for headwall construction during the next few work parties. Stone must not be removed from any stone wall or existing stone structures.
- There is a charity horse ride scheduled on May 23rd and the land owner has asked for our assistance in getting several loops on the trails opened up in time for this event.
- Our next safety awareness event is still being planned for June. No specific date has been set yet.
-Break-
- VASA bid on the new building for $200K and it looks like the purchase will go through.
- Vermont requires that any operator under the age of 18 to have passed the online safety course and received a certificate as proof.
- NH and NY no longer recognize any machine over 50″ wide as an atv. This means that most UTV’s are no longer allowed on NY or NH trail systems.
Attendance: 18
Next meeting will be Thursday May 21, 2009