Excellent turnout for the work party.

Today’s work party was a complete success!  We had 15 members and 14 machines turn out for work.  We managed to clear out all of the water bars on trail #3 and cleared brush on trails #7 and 12.  The work didn’t take very long since we had so much help. The frost was only down 2 to 3 inches so we didn’t have too much trouble digging and trenching around the wet spots and water bars.  We worked from 10:15 till about 12:30 then rode up to the picnic area on Ober hill for lunch.  After lunch, some stayed to ride for a bit longer while others headed for warmer places. Here are a few pictures from the cookout:

There should be some more pictures of the members at work coming soon.

Thanks to everyone that turned out to help.

-Bill
SVTR Webmaster

About Bill

SVTR Webmaster. 2007 Yamaha Rhino 660, 2011 Yamaha Big Bear 400
This entry was posted in Rides, Trails, Work Detail and tagged , , . Bookmark the permalink.